Engineering insights
Notes from Postlight Research on the problems we work on: coordinating building models, keeping them current during construction, and modelling existing buildings from scans. Each note explains the method, where it fails, and how to test it on your own project.
BIM clash detection: triaging real clashes from tolerance noise
19 Nov 2026 · Clash detection
Why clash tests flood coordination with hits nobody acts on, how coordinators rule with a yield hierarchy, and how to evaluate automated clash triage against your own team's past rulings.
BIM progress monitoring: keeping the as-built model current
19 Nov 2026 · Progress monitoring
How video and LiDAR captured during the work map onto IFC4 elements as planned, in progress, built or deviation, with provenance for every state and privacy built into the capture.
Point cloud to BIM with AI: where scan to BIM works and where it breaks
19 Nov 2026 · Scan to BIM
Terrestrial scanning against mobile LiDAR, separating clutter from structure, the failure modes of automated modelling, and the deviation check that proves a model matches its scan.